The following is true of the traditional approach to grid operational risk assessment () .
A: Qualitative analysis
B: Probability analysis
C: Status Assessment
D: All of the above
A: Qualitative analysis
B: Probability analysis
C: Status Assessment
D: All of the above
举一反三
- The following is true of the traditional approach to grid operational risk assessment ( ) . A: Qualitative analysis B: Probability analysis C: Status Assessment D: Qualitative analysis, probability analysis , status Assessment
- the traditional approach to grid operational risk assessment,the following is true ( ) 。 A: Qualitative Analysis B: Qualitative Analysis, probabilistic analysis, status Assessment C: Status Assessment D: probabilistic analysis
- Which one of the following is notincluded in a needs assessment? A: Organizational analysis B: Person analysis C: Competitive analysis D: Task analysis
- Big Data Technology can be applied to optimize the operation of power grid, analysis of operational risks and abnormal power consumption, including ( ) 。 A: Refined management of technical line loss B: Intelligent alarm for electric power dispatching control C: Distribution Network Risk Assessment D: Detection of non-technical line losses E: Assessment of grid operation time for WAMS
- Big Data Technology can be applied to optimize the operation of<br/>power grid, analysis of operational risks and abnormal power<br/>consumption, including () . A: Assessment of grid operation time for WAMS B: Intelligent alarm for electric power dispatching control C: Distribution Network Risk Assessment D: Detection<br/>of non-technical line losses E: Refined management of technical line loss