Routing convergence time is which of the following?()
A: Time required for a VPN connection to occur
B: Time required by protocols to update their forwarding tables after changes have occurred
C: Time required for an IDS to detect suspicious software
D: Time required by switch ports to update their link status and transition to the forwarding state
A: Time required for a VPN connection to occur
B: Time required by protocols to update their forwarding tables after changes have occurred
C: Time required for an IDS to detect suspicious software
D: Time required by switch ports to update their link status and transition to the forwarding state
举一反三
- Owing to small quantity required this time, we have refrained a counter-offer.
- The time required to incline from port to starboard and back to port again is called().
- This new type of surgery is popular because the recovery time is much shorter than that required in ______________ surgeries.
- Time-based strategies focus on reducing the time required to accomplish certain activities, such as new product development or delivery to the customer. ( )
- The payback period of the project refers to项目的投资回收期是指()。 A: Time required to repay all loans of the project 还清项目所有贷款所需的时间 B: The time from the beginning of the project to the time point of the cumulative profit of the project equals to the project cost 从项目开始到项目获得的累计利润等于项目成本所需的时间 C: Time required for the company to obtain sufficient funds to start the project 公司为启动项目而取得足够的资金所需要的时间 D: Time required for the company to recover equity investment after the project is put into operation在项目投产后,公司收回股权投资所需的时间