举一反三
- ● Performing (74) involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results. (74) A. quality planning B. quality assurance C. quality performance D. quality control
- The project team has created a plan for how they will implement the quality policy. If this changes during the project, it will also be a change to ______. A: the project plan B: the quality control plan C: the quality assurance plan D: the quality management plan
- Project Quality Control
- 【单选题】What are the two dimensions that help in defining the quality of a product of quality? A. Product quality and process quality. B. Market-perceived quality and performance quality. C. Product quality and service quality. D. Actual quality and assumed quality E. Absolute quality and relative quality
- One of the fundamental tenets of modern quality management is: A: Quality is planned and inspected i B: Quality does not cos C: Quality is planned, designed, and built in-not inspected i D: Quality requires constant inspectio
内容
- 0
One of the fundamental tenets of modern quality management is: A: A) Quality is planned and inspected in. B: B) Quality does not cost. C: C) Quality is planned, designed, and built in-not inspected in. D: D) Quality requires constant inspection.
- 1
During project execution, a new ISO version of standard 9000 is issued. The project team meets with the quality department to determine how the standard will apply to the project. Which part of the quality process is this A: Quality analysi B: Quality assuranc C: Quality contro D: Quality plannin
- 2
Which of the following costs is NOT an appraisal cost for quality control?
- 3
“Quality manual”means______. A: a quality handbook B: a quality worker C: a quality inspector D: a quality standard
- 4
The Quality Control staff is responsible_____the quality of the products that come out of the factory