If the actual level of activity differs from what was planned, it would be misleading to evaluate performance by comparing actual costs to the static, unchanged planning budget.
A: 正确
B: 错误
A: 正确
B: 错误
举一反三
- The fixed costs in the flexible budget are the same as the planning budget because they do not change in response to changes in the activity level within the relevant range. A: 正确 B: 错误
- The first step in the control process is comparing actual performance against a standard.
- The predetermined overhead rate is calculated as A: actual overhead divided by estimated activity level. B: estimated activity level divided by estimated overhead. C: estimated overhead divided by estimated activity level. D: actual activity level multiplied by estimated overhead.
- A process of comparing the actual performance of a machine with the intended performance, and the adjusting the machine to reduce and eventually eliminate the difference between the actual and intended performance is called() A: open loop control B: feedback C: combining control D: integral proce
- A process of comparing the actual performance of a machine with the intended performance,and then adjusting the machine to reduce and eventually eliminate the difference between the actual and intended performance is called______. A: open loop control B: feedback C: combining control D: integral process