Both the Shipowner and the Charterer will be discharged from their obligations under the charter-party if it()frustrated.
举一反三
- Under<br/>the voyage charter party,the shipowner is responsible for operation<br/>of the ship and the<br/>carriage of goods. ()
- Time chartering means that the shipowner provides a designated manned ship to the charterer, and the charterer employs the ship for a specific period against payment of hire. Under time chartering, the chartering is not liable for costs such as ( )2015年
- The bank’s obligations under the L/C are independent from the buyer’s and seller’s obligations under the contract for the sale of goods.
- If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
- Time chartering means that the shipowner provides a designated manned ship to the charterer, and the charterer employs the ship for a specific period against payment of hire. Under time chartering, the charterer is not liable for costs such as ( )A. bunker costs B. crew wagesC. port charges D. loading costs A: bunker costs B: crew wages C: port charges D: loading costs