举一反三
- In the second step of the control process, actual performance can be considered acceptable as long as the performance doesn't fall ________. A: short of goals by more than 15 percent B: short of goals by more than 30 percent C: inside an acceptable range of variation D: outside an acceptable range of variation
- Managers could choose to do nothing when ________. A: an employee fails to attain the standard because of internal problems B: the difference between actual performance and standard performance is low and acceptable C: performance standards are acceptable, though the employees have not attained it D: the variance observed from the expected performance is caused due to unrealistic standards
- What is the meaning of upper control limit and lower control limit in control charts A: Specification limit B: Acceptable range of the variance of a proces C: Acceptable range of the variance of a produc D: Customer requirement
- Fixed overhead budget variance is the difference between actual fixed overhead and budgeted fixed overhead . ( ) A: 错 B: 对
- A process of comparing the actual performance of a machine with the intended performance, and the adjusting the machine to reduce and eventually eliminate the difference between the actual and intended performance is called() A: open loop control B: feedback C: combining control D: integral proce
内容
- 0
Variance analysis include ( ) A: Schedule variance B: Cost variance C: The schedule performance index D: The cost performance index
- 1
【单选题】The cost associated with the difference between the standard hours and the actual hours of direct labor spent producing a commodity is called the: a. direct labor quantity variance b. direct labor volume variance c. direct labor rate variance d. direct labor time variance A. direct labor quantity variance B. direct labor volume variance C. direct labor rate variance D. direct labor time variance
- 2
The evaluation index of variance analysis in EVM include ( )。 A: Schedule variance (SV) B: Cost performance index (CPI) C: Cost variance (CV) D: Project performance index (PPI)
- 3
Characteristics of a population are called: A: parameters B: statistics C: estimates D: variance
- 4
Performance reports compare actual results to ________. Performance reports also report ________.