Scope change control MUST be integrated with all of the following control processes EXCEPT ______ .
A: schedule
B: cost
C: procurement
D: quality
A: schedule
B: cost
C: procurement
D: quality
举一反三
- Which of the following costs is NOT an appraisal cost for quality control?
- Inputs to determine budget include all of the following EXCEPT (). A: cost baseline B: cost estimate C: work breakdown structure D: project schedule
- ● ()is the application ion of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.()A. Quality assurance (QA) B. Quality planningC. Quality control (QC) D. Quality costs
- Inputs to determine budget include all of the following EXCEPT ______ . A: A) cost baseline B: B) cost estimate C: C) work breakdown structure D: D) project schedule
- Which of the following tests are voluntary processes in a quality control program for a product(software) A: eta test B: performance test C: comparative test D: safety test