Which of the followings is far from Integrated Change Control
A: A) Influencing the factors that create change to ensure that changes are agreed upon.
B: B) Determining that a change has occurred.
C: C) Ensuring the integrated performance baseline doesn't change.
D: D) Managing the actual changes when and as they occur.
A: A) Influencing the factors that create change to ensure that changes are agreed upon.
B: B) Determining that a change has occurred.
C: C) Ensuring the integrated performance baseline doesn't change.
D: D) Managing the actual changes when and as they occur.
举一反三
- All of followings should be done by the project manager during project control except ______. A: Determine the a change has occurred B: Ensure that a change is agreed C: Make sure all changes are approved by management D: Manage changes as they occur
- Lexical changes CANNOT be identified in (). A: lexical change proper B: phonological Change C: mopho-syntactical change D: syntactical change
- You are always______your mind. A: change B: changes C: changing D: to change
- Our city a great deal. It doesn't resemble the one of three years ago. A: changes B: has changed C: is changing D: will change
- People are likely to repond to a policy change A: only if they think the policy is a good one B: only if the policy change changes the benefits of their behavior C: only if the policy change changes the costs of their behavior D: only if the policy change changes either the costs or benefits of their behavior