Scope change control MUST be integrated with all of the following control processes EXCEPT ______ .
A: A) schedule
B: B) cost
C: C) procurement
D: D) quality
A: A) schedule
B: B) cost
C: C) procurement
D: D) quality
举一反三
- Scope change control MUST be integrated with all of the following control processes EXCEPT ______ . A: A) schedule B: B) cost C: C) procurement D: D) quality
- Which of the following costs is NOT an appraisal cost for quality control?
- Inputs to determine budget include all of the following EXCEPT (). A: cost baseline B: cost estimate C: work breakdown structure D: project schedule
- Inputs to determine budget include all of the following EXCEPT ______ . A: A) cost baseline B: B) cost estimate C: C) work breakdown structure D: D) project schedule
- Which of the following tests are voluntary processes in a quality control program for a product(software) A: eta test B: performance test C: comparative test D: safety test